BIM workflow automation
Removing the repetitive work from the way your team already models.
Most BIM teams lose hours every week to work a machine should be doing. Renaming sheets one at a time. Retyping the same parameter across three hundred elements. Exporting a drawing set by hand because the naming convention lives in somebody's head rather than in a script.
We start by watching how your team actually models — not how the BEP says they should. The repetitive steps show up quickly, and most of them turn out to be two or three rules applied consistently. Those become tools: a button on the ribbon, a scheduled audit, an export that runs to your naming standard every time without anyone thinking about it.
The result is not a faster modeller. It is a modeller who spends the afternoon on the problem that actually needed judgement, and the model that carries its information forward instead of losing it at every handover.
Where the work actually happens
- Process optimisation and workflow mapping
- Revit add-in development
- pyRevit and Dynamo scripting
- Tailor-made workflow solutions
- Batch parameter and sheet operations
- Automated model audits and QA routines
Start with the audit.
It costs little, it takes two sessions, and it tells you which of these five is actually worth buying first.

